Filter By

  • Leonardo Proposal for Category 2: “On-Board Atomic Clocks”: Rb POP

    Start date: 31/01/2020
    Duration: 6 Months

    Activity Code: H2020-038.06

    Category: Galileo

    Theme: On Board Atomic Clocks

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”,  the activity targets the design and the development of a high level architecture for an on-board atomic clock based on Rb pulsed optically-pumped approach in a vapour cell. Within this activity, the most critical required items shall be indenfitied. It is justified by…

    Prime contractor

    Name: Leonardo

    Website: https://www.leonardocompany.com

    Subcontractors

    Name(s): Instituto Nazionale di Ricerca Metrologica

  • CsC4Gal - on-board Cs-clock proposal

    Start date: 07/02/2020
    Duration: 6 Months

    Activity Code: H2020-038.08

    Category: Galileo

    Theme: On Board Atomic Clocks

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”, the activity targets the design and the development of a high level architecture for an on-board clock based on optically-pumped Cs thermal beam technology developed for an existing product for ground applications. Within this activity, the most critical required items shall be…

    Prime contractor

    Name: TESAT

    Website: http://www.tesat.de/de/

    Subcontractors

    Name(s): Oscilloquartz SA

  • Iodine Optical Clock for G2G

    Start date: 12/02/2020
    Duration: 6 Months

    Activity Code: H2020-038.05

    Category: Galileo

    Theme: On Board Atomic Clocks

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”, the activity targets the design and the development of a high level architecture for an on-board clock solution based on a laser stabilised iodine vapour cell, down-converted to RF via a stabilised optical frequency comb. Within this activity, the most critical required items…

    Prime contractor

    Name: SpaceTech GmbH

    Country: Germany

    Website: https://www.spacetech-i.com/

    Subcontractors

    Name(s): Menlo System GmbH, DLR, Humboldt Innovation GmbH, Ferdinand Braun-Institut Berlin

  • AGES, Accelerometry for Galileo Enhancement and Science

    Start date: 01/03/2020
    Duration: 15 Months

    Activity Code: H2020-038.02

    Category: Galileo

    Theme: Payload

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”, an accelerometer devoted to measure the Non Gravitational Perturbations has been identified as one of the candidate experimental payloads of 2nd generation Galileo S/C. Such an accelerometer is intended to provide operational benefits to the system and to foster its scientific…

    Prime contractor

    Name: INAF (National Institute for Astrophysics)

    Website: http://www.inaf.it/en

    Subcontractors

    Name(s): TAS-I

  • Feasibility analysis of ARAIM ISM generation by EGNOS

    Start date: 06/03/2020
    Duration: 18 Months

    Activity Code: H2020-036

    Category: EGNOS

    The activity comprises of: 1. Assessment of the current Milestone Reports produced by the EU-US WG-C ARAIM TSG in regards to the performance needs and constraints associated of the H-ARAIM and V-ARAIM Integrity Support Message (ISM) for both the on-line and off-line architectures 2. Identification of System requirements and architecture design trade‑offs 3. Prototyping of a Test-Bed…

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/de/global/activities/space

    Subcontractors

    Name(s): Deimos Space S.L.U

  • Solar Radiation Pressure (SRP) Modelling for short term Galileo orbit estimation

    Start date: 12/03/2020
    Duration: 12 Months

    Activity Code: H2020-038.11

    Category: Galileo

    Theme: European GNSS Scientific Studies

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”, this study has as main objective to remove orbit systematic errors thanks to a deterministic model tuned to take into account observation using clock modelling and Satellite Laser Ranging measurements.  The ultimate aim of this new study aims to further develop a new SRP…

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com/space.html

    Subcontractors

    Name(s): University Bern

  • GASTON: GAlileo Survey of Transient Objects Network

    Start date: 01/04/2020
    Duration: 12 Months

    Activity Code: H2020-038.10

    Category: Galileo

    Theme: European GNSS Scientific Studies

    In the frame of the Call for Ideas “H2020-ESA-038 GNSS Evolutions Experimental Payloads and Science Activities”, this activity aims at discovering and detecting dark matter using Galileo. It will monitor the highly precise synchronised clocks of the Galileo constellation and analysing glitches and transients which might be correlated with Dark Matter movement or crossings. The project…

    Prime contractor

    Name: CNRS -CENTRE NAT.DE LA RECHERCE SCI

    Website: http://www.cnrs.fr/

    Subcontractors

    Name(s): Observatoire Royale de Belgique

  • G2G TEST USER RECEIVER TECHNOLOGIES FRAMEWORK - WO2: OPEN SERVICE BREAD-BOARD EMULATING PROFESSIONAL PLATFORMS

    Start date: 29/04/2020
    Duration: 38 Months

    Activity Code: H2020-008.02

    Category: Technology

    This activity targets the design, implementation, integration and test of a Bread Board (BB) emulating current and future performances of a number of positioning mid-end/high-end platforms (where robust high-accuracy is a driving factor) relying on Galileo 2nd Generation OS SIS, multi-constellation, multi-frequency and sensor hybridisation/fusion. In particular, the BB focuses on the Autonomous…

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/de/global/activities/space