Projects

Filter By

  • Attitude Control Sensors

    Activity Code: H2020-ESA-006

    Category: Technology

    Theme: Platform

    Objectives: H2020 WP15 H006 - Attitude Control Sensors. This activity addresses the development of the new generation Infra-Red Earth Sensor for Medium Earth Orbit, in support of Galileo 2nd Generation activities. This includes the design, manufacturing and testing of the sensor.

    Prime contractor

    Name: Leonardo

    Website: https://www.leonardocompany.com

  • GNSS Evolutions Ground Segment Phase B1 – Work Order 4

    Activity Code: H2020-ESA-022.04

    Category: Galileo

    Theme: Ground Segment

    Objectives: H2020 WP16 H022 - GNSS Evolutions Ground Segment Phase B1: implementation of Phase B1 for an initial design of the Galileo Second Generation Ground Segment.

    Prime contractor

    Name: GMV

    Website: https://www.gmv.com

  • GNSS Evolutions System Phase B Framework – Work Order 2: Signal-in-Space

    Activity Code: H2020-ESA-020.02

    Category: Galileo

    Theme: System

    Objectives: H2020 WP16 H020 - GNSS Evolutions System Phase B1 Framework: Framework contract for System activities for the Phase B1 of Galileo Second Generation

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com

  • GNSS Evolutions System Phase B Framework – Work Order 3: Security and PRS

    Activity Code: H2020-ESA-020.03

    Category: Galileo

    Theme: System

    Objectives: H2020 WP16 H020 - GNSS Evolutions System Phase B1 Framework: Framework contract for System activities for the Phase B1 of Galileo Second Generation
  • Inter-Satellite Link Engineering Qualification Model

    Activity Code: H2020-ESA-026.3

    Category: Galileo

    Theme: Payload

    Objectives: H2020-ESA-026 Inter-Satellite Link (ISL). This activity is aimed at supporting the development of full Inter-Satellite Link considered for Galileo 2nd Generation, with particular attention to development and qualification of critical RF units and antenna scan mechanism, and eventual integration and testing of ISL payload.

    Prime contractor

    Name: TESAT

    Website: https://www.tesat.de/

  • C-Band Advanced Receiver

    Activity Code: H2020-ESA-027.1

    Category: Galileo

    Theme: Payload

    Objectives: H2020-ESA-027 C-Band Advanced Receiver - Activity in support to the development of the new generation of mission receiver, C-Band Advanced Receiver (CBAR), compatible with Galileo 2nd Generation.

    Prime contractor

    Name: TESAT

    Website: https://www.tesat.de/

  • C-Band Advanced Receiver

    Activity Code: H2020-ESA-027.2

    Category: Galileo

    Theme: Payload

    Objectives: H2020-ESA-027 C-Band Advanced Receiver - Activity in support to the development of the new generation of mission receiver, C-Band Advanced Receiver (CBAR), compatible with Galileo 2nd Generation.

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/en/global/activities/space

  • Advanced ODTS Algorithms Test Platform & Experimentation

    Activity Code: H2020-ESA-031

    Category: Galileo

    Theme: System

    Objectives: H2020-ESA-031 - Activity to develop a long term experimentation platform with the GNSS Evolutions Orbit Determination and Time Synchronisation (ODTS) algorithms using real data from various sources, including GNSS and SLR, and modelled/extrapolated data (e.g. Inter-Satellite Links ranging observables).

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/en/global/activities/space

  • G2G Constellation Mission Analysis Tool (G2-CMAT)

    Activity Code: H2020-ESA-032

    Category: Technology

    Theme: System

    Objectives: This activity entails the development of a modular software tool for mission analysis and satellite development considering the G2G launch scenarios, launcher model and satellite models in terms of thruster profile and manoeuvres, launch window, radiation environment impact, operational constraints.

    Prime contractor

    Name: GMV

    Website: https://www.gmv.com

  • Assessment of system improvements aligned to new EGNOS Mission needs

    Activity Code: H2020-ESA-035.01

    Category: EGNOS

    Theme: System

    Objectives: H2020-ESA-035 - Assessment of system improvements aligned to new EGNOS mission needs. This study shall address the improvement of SBAS system features including Time-To-Alarm (TTA), performance budgets and Protection Levels (XPL) with the aim of improving system performances

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com