Start date: 01/06/2017Duration: 32 MonthsActivity Code: H2020-006
Category: Galileo
Theme: Platform
As part of the attitude control subsystem, the Earth Sensors used in 1st Generation Satellites are based on Infrared sensors developed originally for Geostationary satellites. For MEO they are not fully fitted, which result in supplementary operations. This activity is addressing the development of a new generation of Infra Red Earth Sensors (IRES) specifically optimized for use in MEO…Prime contractor
Name: Leonardo
Website: https://www.leonardocompany.com
GNSS Evolutions System Phase B G2G -General System Engineering
Start date: 01/01/2018Duration: 18 MonthsActivity Code: H2020-020.01.01
Category: Galileo
Theme: System
The main objective of this activity is to support ESA at System level in its role as System Architect for the GNSS Galileo Evolutions G2G. The main support is focus on the following tasks: Support ESA as System Architect of the GNSS Galileo Evolutions. Consolidate the Mission/System Evolution Scenarios from Phase A. Close-out and the Transition Scenario including system use case, concept…Prime contractor
Name: Airbus
Website: https://www.airbus.com/space.html
Subcontractors
Name(s): Vitrociset Belgium, Deimos
GNSS Evolutions System Phase B G2G -General System Engineering
Start date: 01/01/2018Duration: 18 MonthsActivity Code: H2020-020.01.02
Category: Galileo
Theme: System
The main objective of this activity is to support ESA at System level in its role as System Architect for the GNSS Galileo Evolutions G2G. The main support is focus on the following tasks: Support ESA as System Architect of the GNSS Galileo Evolutions. Consolidate the Mission/System Evolution Scenarios from Phase A. Close-out and the Transition Scenario including system use case, concept…Prime contractor
Name: Thales Alenia Space
Website: https://www.thalesgroup.com/en/global/activities/space
GNSS Evolutions Space Segment Phase B - contract 1
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-021.01
Category: Galileo
Theme: Platform
In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…Prime contractor
Name: Airbus
Website: https://www.airbus.com/space.html
GNSS Evolutions Space Segment Phase B - contract 2
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-021.02
Category: Galileo
Theme: Platform
In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…Prime contractor
Name: Thales Alenia Space
Website: https://www.thalesgroup.com/en/global/activities/space
GNSS Evolutions Space Segment Phase B - contract 3
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-021.03
Category: Galileo
Theme: Platform
In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…Prime contractor
GNSS Evolutions Ground Segment Phase B - contract 1
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-022.01
Category: Galileo
Theme: Ground Segment
The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…Prime contractor
Name: Thales Alenia Space
Website: https://www.thalesgroup.com/en/global/activities/space
GNSS Evolutions Ground Segment Phase B - contract 2
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-022.02
Category: Galileo
Theme: Ground Segment
The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…Prime contractor
Name: Airbus
Website: https://www.airbus.com/space.html
GNSS Evolutions Ground Segment Phase B - contract 3
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-022.03
Category: Galileo
Theme: Ground Segment
The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…Prime contractor
Name: CGI
Website: https://www.cgi.com
GNSS Evolutions Ground Segment Phase B - contract 4
Start date: 01/01/2018Duration: 13 MonthsActivity Code: H2020-022.04
Category: Galileo
Theme: Ground Segment
The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…Prime contractor
Name: GMV