  • Attitude Control Sensor

    Start date: 01/06/2017
    Duration: 32 Months

    Activity Code: H2020-006

    Category: Galileo

    Theme: Platform

    As part of the attitude control subsystem, the Earth Sensors used in 1st Generation Satellites are based on Infrared sensors developed originally for Geostationary satellites. For MEO they are not fully fitted, which result in supplementary operations. This activity is addressing the development of a new generation of Infra Red Earth Sensors (IRES) specifically optimized for use in MEO…

    Prime contractor

    Name: Leonardo

    Website: https://www.leonardocompany.com

  • GNSS Evolutions System Phase B G2G -General System Engineering

    Start date: 01/01/2018
    Duration: 18 Months

    Activity Code: H2020-020.01.01

    Category: Galileo

    Theme: System

    The main objective of this activity is to support ESA at System level in its role as System Architect for the GNSS Galileo Evolutions G2G. The main support is focus on the following tasks: Support ESA as System Architect of the GNSS Galileo Evolutions. Consolidate the Mission/System Evolution Scenarios from Phase A. Close-out and the Transition Scenario including system use case, concept…

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com/space.html

    Subcontractors

    Name(s): Vitrociset Belgium, Deimos

  • GNSS Evolutions System Phase B G2G -General System Engineering

    Start date: 01/01/2018
    Duration: 18 Months

    Activity Code: H2020-020.01.02

    Category: Galileo

    Theme: System

    The main objective of this activity is to support ESA at System level in its role as System Architect for the GNSS Galileo Evolutions G2G. The main support is focus on the following tasks: Support ESA as System Architect of the GNSS Galileo Evolutions. Consolidate the Mission/System Evolution Scenarios from Phase A. Close-out and the Transition Scenario including system use case, concept…

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/en/global/activities/space

  • GNSS Evolutions Space Segment Phase B - contract 1

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-021.01

    Category: Galileo

    Theme: Platform

    In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com/space.html

  • GNSS Evolutions Space Segment Phase B - contract 2

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-021.02

    Category: Galileo

    Theme: Platform

    In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/en/global/activities/space

  • GNSS Evolutions Space Segment Phase B - contract 3

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-021.03

    Category: Galileo

    Theme: Platform

    In 2015, the European Commission implemented the Horizon 2020 Framework Programme for Research and Innovation in Satellite Navigation with the goal of preparing the future of Galileo. Within this context, the investigation of the next generation of Galileo satellites (Galileo 2nd Generation - G2G) is essential. In particular, the G2G satellites must have the ability to replenish the constellation…

    Prime contractor

    Name: OHB System AG

    Country: Germany

    Website: https://www.ohb-system.de/main-company.html

  • GNSS Evolutions Ground Segment Phase B - contract 1

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-022.01

    Category: Galileo

    Theme: Ground Segment

    The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…

    Prime contractor

    Name: Thales Alenia Space

    Website: https://www.thalesgroup.com/en/global/activities/space

  • GNSS Evolutions Ground Segment Phase B - contract 2

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-022.02

    Category: Galileo

    Theme: Ground Segment

    The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…

    Prime contractor

    Name: Airbus

    Website: https://www.airbus.com/space.html

  • GNSS Evolutions Ground Segment Phase B - contract 3

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-022.03

    Category: Galileo

    Theme: Ground Segment

    The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…

    Prime contractor

    Name: CGI

    Website: https://www.cgi.com

  • GNSS Evolutions Ground Segment Phase B - contract 4

    Start date: 01/01/2018
    Duration: 13 Months

    Activity Code: H2020-022.04

    Category: Galileo

    Theme: Ground Segment

    The G1G Ground Segment (i.e. GMS and GCS) design started almost 20 years ago driven by the standalone Galileo Safety of Life service and inherited the design of EGNOS that itself was from the 90’s. A need for stronger Security requirements came out later during the G1G GSEG detailed design phases, and are continuously evolving. In addition, as the system matures, so the need for more automation…

    Prime contractor

    Name: GMV

    Website: https://www.gmv.com